Negotiable
The date of payment from buyers deliver within days
Shandong
Long-term effective
2017-12-01 05:14
109
Company Profile
By certification [File Integrity]
Contact: ytjinyuankuangye(Mr.)
Email:
Telephone:
Phone:
Area: Shandong
address: No 7 weiwu Road, Yantai Hi-tech Industry
Website: http://www.mineralprocessing-epc.com/ http://ytjinyuankuangye.ouerwanju.com/
Bood Lumo 60K Puffs
unit price:Negotiable
Bood 150K 7 IN 1 Vape
unit price:Negotiable
Vapsolo Quads 80k Puffs Vape
unit price:Negotiable
Bood Pulse Storm 12k
unit price:Negotiable
Bood Twins 46k Puffs Vape
unit price:Negotiable
Joint Wrapping Tape
unit price:Negotiable
If you are looking for updated high-efficiency thickener China from best updated high-efficiency thickener suppliers, please feel free to contact Jinyuan Mining Machinery.
Specifications of the updated high-efficiency thickener
Model |
m Diameter of the tank |
m Depth of the tank |
Setting area m2 |
Capacity t/d |
Motor |
kg Weight of the tank |
Weight kg |
|
Model |
kw Power |
|||||||
NZSG-2.5 |
2.5 |
1.85 |
4.9 |
5~22.4 |
Y90L-6 |
1.1 |
2225 |
|
NZSG-3A |
3.0 |
1.8 |
7 |
5~23.3 |
Y100L-6 |
1.5 |
1633 |
3167 |
NZSG-3 |
3.6 |
1.8 |
10.2 |
5~25 |
Y100L-6 |
1.5 |
2097 |
3680 |
NZSG-5 |
5 |
2.956 |
16 |
16~90 |
Y90L-4 |
1.5 |
5160 |
8031 |
NZSG-6 |
6 |
2.956 |
28 |
98 |
Y90L-4 |
1.5 |
5437 |
9200 |
NZSG-7 |
7 |
3 |
38.5 |
130 |
Y112M-6 |
2.2 |
8548 |
13361 |
NZSG-8 |
8 |
3.318 |
50.2 |
180 |
Y132S-6 |
3 |
12966 |
19289 |
NZSG-9 |
9 |
3.376 |
63.0 |
210 |
Y132S-6 |
3 |
15439 |
21960 |
NZSG-10 |
10 |
3.446 |
78 |
273 |
Y132S-6 |
3 |
16565 |
23080 |
NZSG-12 |
12 |
3.6 |
113 |
370 |
Y132S-6 |
3 |
26421 |
35300 |
NZSG-15 |
15 |
3.844 |
176 |
580 |
Y132M2-6 |
5.5 |
34741 |
47075 |
NZSG-18 |
18 |
3.6 |
255 |
892 |
Y132M2-6 |
5.5 |
45590 |
71655 |
Note: 1、The size can be specially designed according to customer's request. 2、The capacity will be increased up to 3~6 times if flocculent is added.
Its main characteristics are:
(1) Deaeration cell is provided to avoid bobble on which solid particles may attach and settle as “parachute phenomena”. (2) The mineral feeding pipe is beneath the liquid surface level to prevent air to be brought in by feeding. (3) Inner overflow weir is equipped to let the slurry flow on pre-designed route, avoiding “short circuit”. (4) The pattern of the overflow weir is made into indented shape, eliminating suction phenomena in some part of draining induced by unleveled overflow weir.
